... according to the ball band, each skein is 90 meters, so I have 900 meters; but
... according to Ravelry, each skein has 79 meters, which bring my total to 790 meters; and
... according to the pattern, I need 900 meters to knit the second size with a 35 1/2 " bust.
What to do? Knit on anyway!
I knit a gauge swatch, washed and dried it and weighed it, just in case I need to frog it for the yardage, and bravely started the first sleeve.
This is the back. I'm about 8 inches up and I just started the second ball of yarn. I hope to complete this piece with only 3 balls.
Wish me luck!
No comments:
Post a Comment